What Should I Expect During the Design Phase of a Remodel?

June 24, 2025

When you’re planning a remodel, it’s easy to focus on the construction—the dust, the demo, the finished result. But some of the most important work happens long before the first hammer ever swings.


At The Building Company, we believe great remodels are built on great planning. That’s why the design phase is one of the most important parts of the process—and one of the biggest predictors of how smoothly your remodel will go.



If you’ve never been through a renovation before, here’s what you can expect—and how we help you get it right from the start.

Design Isn’t Just Picking Finishes

Many people think “design” means picking paint colors, cabinet door styles, or what kind of tile goes in the bathroom. That’s part of it—but it’s not the whole picture.


The design phase includes:


Layout planning: How will your space flow? Are we moving walls or windows?


Structural considerations: What needs to be engineered or permitted?


Material selection: Cabinets, countertops, fixtures, flooring, lighting


Coordination with trades: Making sure plumbers, electricians, and HVAC pros are aligned with the plan



Budget clarity: Matching your goals with real-world pricing


We work with trusted local designers to help you put all these pieces together before construction begins. Our job is to guide, coordinate, and make sure the plan is buildable, on-budget, and aligned with your lifestyle.

We Partner With Designers—Not Replace Them

Unlike some firms that try to do everything in-house, we believe in working with specialists. That means we collaborate with talented local designers who focus entirely on design—while we focus on construction.


You’re not locked into any one person, and we’re happy to recommend professionals who match your project style, budget, and personality. Once you’ve selected your designer, we work together from the very beginning to:


● Review the plans for constructability


● Confirm layout feasibility and structural needs


● Preempt possible challenges before they become expensive mistakes


This team-based approach ensures your vision is beautiful, practical, and ready for permitting.

Why the Design Phase Matters So Much

Here’s what a well-run design phase prevents:


● Costly change orders during construction


● Layout surprises that stall progress


● Finish choices that don’t fit your budget or timeline


● Miscommunication between trades, designers, and contractors


It’s also when we identify opportunities—like reusing plumbing locations, opening up views, or simplifying HVAC runs—that can save you time and money.



This phase sets the entire tone for your remodel. It’s where clarity and alignment are built.

📅 What the Timeline Looks Like

While every project is different, most design phases take 4–8 weeks, depending on:



● Project scope (a kitchen vs. a whole home)


● Permitting requirements


● Design revisions and client feedback loops


● How quickly selections are made


We help guide the process so you’re not overwhelmed or stuck waiting on decisions. And we don’t start demo until the major design questions are settled and approved.

🧱 Real-Life Example

A Spokane couple we worked with last year wanted to open up their main floor—but were unsure about what walls could go. We brought in a designer and a structural partner early, and within a few weeks they had a layout that not only worked, but also added more light and better kitchen flow.



Because everything was designed and approved before construction started, we hit the ground running—no midstream design changes, no budget shocks.

What Happens After Design?

Once design is complete and permits are in hand, we finalize your construction agreement. At that point, we:



● Lock in your schedule


● Order long-lead materials


● Assign your project manager


● Prep for a smooth and organized build


You’ll already know what to expect—because you helped plan it.

Want to Start Your Remodel the Right Way?

Let’s talk through your ideas, recommend a great designer if you need one, and build a plan that makes sense for your goals and budget.


📱 Call or text: 509-625-6500

 📧 Email: info@pnwbuild.com

 🔗 Schedule a consult

________________________________________


The Building Company is a proud member of the National Association of Home Builders (NAHB) and the National Association of the Remodeling Industry (NARI), reflecting our commitment to ethical practices, client-first design, and quality craftsmanship.

A kitchen with white cabinets , a stove , a sink , and a window.
June 24, 2025
Most standard kitchen remodels take 6–10 weeks of construction time once work begins. But that’s only one phase. Here’s how it breaks down:
There is a ladder in the middle of the room.
June 24, 2025
Remodeling your home is exciting—but it also raises one of the most practical and anxiety-inducing questions for homeowners:
A blue house with a white picket fence and the number 940 on the front
June 24, 2025
If you’ve ever talked to someone who had a bad remodeling experience, there’s a good chance the story includes change orders. Maybe their builder kept tacking on extra costs. Maybe the budget ballooned with “surprise” work. Maybe the original price just wasn’t real to begin with.
A kitchen with white cabinets , stainless steel appliances , and a large island.
June 24, 2025
If you're thinking about remodeling your kitchen, you're probably picturing the end result: the quartz counters, soft-close drawers, that new tile you saw on Pinterest.
The front porch of a blue house with wooden steps and potted plants.
June 19, 2025
“How long is this going to take?” It’s one of the first questions most homeowners ask—and for good reason. Remodeling means living in a space that’s changing daily. It disrupts routines. It involves dozens of moving parts. And let’s be honest—it often takes longer than people expect.
A row of houses with snow on the roofs
June 19, 2025
Remodeling your home should be exciting—not stressful. But we’ve heard too many horror stories from homeowners in Spokane and North Idaho who found themselves stuck in nightmare projects they never saw coming.
A wooden staircase with boxes on the bottom of it
June 18, 2025
When homeowners think about remodeling, one of the biggest unknowns is cost. But here’s the truth: setting a realistic budget doesn’t start with a number—it starts with understanding your goals, your home, and what’s possible.
A kitchen with a table , stove , microwave and ceiling fan.
June 18, 2025
How Long Will My Remodel Take? Realistic Timelines for Spokane & North Idaho Projects One of the most common questions we get at The Building Company is: “How long will this take?” And we get it—remodeling can be exciting, but it’s also disruptive. Whether you’re planning a new bathroom in Coeur d’Alene or a whole-home remodel in Spokane Valley, knowing the timeline helps you plan life around the work. So, let’s break it down.
A row of white houses with red tile roofs
June 16, 2025
Accessory Dwelling Units (ADUs) are on the rise in Spokane, Coeur d'Alene, and surrounding communities—from backyard cottages in South Hill to garage conversions in Sandpoint. Whether you’re building space for family, planning for rental income, or preparing for multi-generational living, ADUs can be a smart investment.
A blue house with the number 1040 on the front
June 16, 2025
If you’ve never remodeled before, the design phase can feel a bit mysterious. You know you want a new kitchen, a better bathroom, or more space—but how do you get from idea to blueprint to build?
More Posts