What Should I Expect During the Design Phase of a Remodel?

June 24, 2025

When you’re planning a remodel, it’s easy to focus on the construction—the dust, the demo, the finished result. But some of the most important work happens long before the first hammer ever swings.


At The Building Company, we believe great remodels are built on great planning. That’s why the design phase is one of the most important parts of the process—and one of the biggest predictors of how smoothly your remodel will go.



If you’ve never been through a renovation before, here’s what you can expect—and how we help you get it right from the start.

Design Isn’t Just Picking Finishes

Many people think “design” means picking paint colors, cabinet door styles, or what kind of tile goes in the bathroom. That’s part of it—but it’s not the whole picture.


The design phase includes:


Layout planning: How will your space flow? Are we moving walls or windows?


Structural considerations: What needs to be engineered or permitted?


Material selection: Cabinets, countertops, fixtures, flooring, lighting


Coordination with trades: Making sure plumbers, electricians, and HVAC pros are aligned with the plan



Budget clarity: Matching your goals with real-world pricing


We work with trusted local designers to help you put all these pieces together before construction begins. Our job is to guide, coordinate, and make sure the plan is buildable, on-budget, and aligned with your lifestyle.

We Partner With Designers—Not Replace Them

Unlike some firms that try to do everything in-house, we believe in working with specialists. That means we collaborate with talented local designers who focus entirely on design—while we focus on construction.


You’re not locked into any one person, and we’re happy to recommend professionals who match your project style, budget, and personality. Once you’ve selected your designer, we work together from the very beginning to:


● Review the plans for constructability


● Confirm layout feasibility and structural needs


● Preempt possible challenges before they become expensive mistakes


This team-based approach ensures your vision is beautiful, practical, and ready for permitting.

Why the Design Phase Matters So Much

Here’s what a well-run design phase prevents:


● Costly change orders during construction


● Layout surprises that stall progress


● Finish choices that don’t fit your budget or timeline


● Miscommunication between trades, designers, and contractors


It’s also when we identify opportunities—like reusing plumbing locations, opening up views, or simplifying HVAC runs—that can save you time and money.



This phase sets the entire tone for your remodel. It’s where clarity and alignment are built.

📅 What the Timeline Looks Like

While every project is different, most design phases take 4–8 weeks, depending on:



● Project scope (a kitchen vs. a whole home)


● Permitting requirements


● Design revisions and client feedback loops


● How quickly selections are made


We help guide the process so you’re not overwhelmed or stuck waiting on decisions. And we don’t start demo until the major design questions are settled and approved.

🧱 Real-Life Example

A Spokane couple we worked with last year wanted to open up their main floor—but were unsure about what walls could go. We brought in a designer and a structural partner early, and within a few weeks they had a layout that not only worked, but also added more light and better kitchen flow.



Because everything was designed and approved before construction started, we hit the ground running—no midstream design changes, no budget shocks.

What Happens After Design?

Once design is complete and permits are in hand, we finalize your construction agreement. At that point, we:



● Lock in your schedule


● Order long-lead materials


● Assign your project manager


● Prep for a smooth and organized build


You’ll already know what to expect—because you helped plan it.

Want to Start Your Remodel the Right Way?

Let’s talk through your ideas, recommend a great designer if you need one, and build a plan that makes sense for your goals and budget.


📱 Call or text: 509-625-6500

 📧 Email: info@pnwbuild.com

 🔗 Schedule a consult

________________________________________


The Building Company is a proud member of the National Association of Home Builders (NAHB) and the National Association of the Remodeling Industry (NARI), reflecting our commitment to ethical practices, client-first design, and quality craftsmanship.

A man is drawing a floor plan with a pencil.
July 21, 2025
If you’re planning a remodel in Spokane, Coeur d’Alene, or anywhere across North Idaho, you’ve probably heard the term design-build. It’s become a buzzword — but what does it really mean? And how is it different from the traditional remodeling process?
A kitchen with white cabinets , a stove , a sink , and a window.
July 21, 2025
At The Building Company, we know the days leading up to construction can feel both exciting and overwhelming. Whether you're remodeling a kitchen, bathroom, or tackling a full addition in Spokane or North Idaho, a little prep goes a long way toward a smooth experience.
A kitchen with stainless steel appliances and granite counter tops
July 21, 2025
Whether you’re in Spokane, Coeur d’Alene, or a surrounding North Idaho town like Spirit Lake or Liberty Lake, one thing’s clear: Accessory Dwelling Units (ADUs) are becoming one of the most popular ways to create flexible living space — and long-term value.
A large house with a porch and a lot of windows
July 9, 2025
At The Building Company, we’ve worked with families from Spokane Valley to Sandpoint through everything from kitchen gut jobs to full-scale home renovations. The answer? It depends—on what you’re remodeling, how your home is laid out, and how much disruption you’re willing to live with.
A woman is holding a hard hat in front of a building.
July 9, 2025
It’s almost here — the day the old makes way for the new. You’ve signed the contract. You’ve picked your finishes. The crew is lined up. Now it’s time for Demo Day — one of the biggest milestones in any remodel.
A kitchen under construction with white cabinets and a sink.
July 9, 2025
If you’ve never done a remodel before, the term change order might sound intimidating. Or maybe you’ve heard horror stories about contractors using surprise change orders to jack up the price mid-project.
June 28, 2025
If you’re planning a remodel, you’ve probably heard these words used interchangeably: estimate, quote, bid. But they’re not the same — and knowing the difference can save you from nasty surprises mid-project. At The Building Company, we think homeowners should understand what they’re looking at when they compare contra
A kitchen under construction with white cabinets and a sink.
June 28, 2025
One of the most common questions homeowners ask—often right up front—is: “Can you just give me the final price right now?” It’s a fair question. Remodeling is a big investment, and you want to know what you’re signing up for.
A clipboard with a calculator on it is surrounded by construction tools.
June 27, 2025
You’ve hired a contractor. Plans are in motion. Demo starts—and suddenly, the crew finds something behind the wall that no one saw coming.
A man is kneeling down in a room looking at a blueprint.
June 27, 2025
It’s a fair question—and one we’ve heard more than once. “If you’re using subcontractors for the plumbing, electrical, and finish work… what exactly does The Building Company do?” The short answer? A lot more than you might think.