How Do I Make Sure My Remodel Stays on Schedule?
A Spokane & North Idaho Homeowner’s Guide to Staying on Track (and Sane) During a Remodel
Let’s be honest: remodels have a reputation for taking longer than expected. And in some cases, that reputation is well-earned. But it doesn’t have to be that way.
At The Building Company, we’ve completed dozens of kitchen, bath, and whole-home remodels from Spokane Valley to Sandpoint. We know that time is just as important as budget — and the key to protecting it is planning, process, and communication.
Here’s what actually causes remodel delays — and how to keep your project on track.
🧱 Why Remodels Go Off-Schedule
Before you can avoid delays, it helps to understand where they come from. Most common culprits include:
- Permitting slowdowns: Waiting on approvals from your city or county
- Product lead times: Cabinets, tile, or windows that are backordered or delayed
- Change orders: Mid-project changes that shift scope or sequencing
- Unforeseen conditions: Hidden water damage, electrical surprises, or outdated framing
- Trade bottlenecks: Waiting on one sub before the next can start
- Lack of planning: Starting construction before everything is ordered or approved
None of these issues are uncommon — but with the right systems in place, they don’t have to derail your timeline.
🛠️ How We Keep Remodels Moving
At The Building Company, we focus on front-loading the planning process so your project runs smoothly once construction begins.
🔍 1. Detailed Preconstruction Phase
Before a single wall comes down, we’ve already:
- Finalized layout and scope
- Helped select materials (with realistic lead times)
- Secured permits
- Lined up our trades in proper sequence
You’re not approving finishes in a panic at the paint store. You’re set up for success before we start.
🗂 2. Clear, Realistic Scheduling
We’ll walk you through:
- The major phases of the project
- What’s happening each week
- When things need to be decided or ordered
We don’t give fake “two-week kitchen” promises. We give realistic timelines with buffer for the unpredictable.
📲 3. Weekly Check-ins
We keep communication open and consistent — whether that’s in person, by phone, or through our project management tools. You’ll never wonder:
- “What’s going on this week?”
- “Who’s showing up today?”
- “Why hasn’t drywall started yet?”
And if something unexpected comes up, you’ll hear it from us first — along with our plan to solve it.
🧠 What You Can Do to Keep Things on Track
Homeowners play a huge role in schedule success. Here’s how to help:
Make decisions early: Try not to delay tile, hardware, or appliance selections
Stick to the plan: Change orders add time — even small ones
Be responsive: A quick reply to a text or email keeps momentum going
Trust the process:
We’ve done this before — and we’ll keep you informed at every step
Real Talk: Not Everything Is in Anyone’s Control
Sometimes a snowstorm delays delivery. Sometimes the countertop arrives cracked. Sometimes inspectors reschedule.
But when you work with a professional GC, you’re hiring someone who plans for the curveballs and keeps the entire project moving forward.
You’re not just hiring a builder — you’re hiring a
problem-solver.
Let’s Build Your Remodel Without the Chaos
If you’re thinking about remodeling in Spokane, Coeur d’Alene, or the surrounding areas, let’s talk. We’ll walk you through how our process keeps your project on time and on target.